Descargar Imprimir esta página

Bradley Verge LVQD3 Instalación página 16

Publicidad

Idiomas disponibles

Idiomas disponibles

LVQD3
11
Control Box and Valve Installation
Secure control box to
A
underside of bowl using
(2) #10 x 1/2" long screws
provided.
Secure cable duct to bowl
at location shown with (2)
B
#10 screws provided, one
per WashBar. Run loose
wire and cables through
the cable duct (3 places).
Cable Duct
(255-058)
Hot Supply/Stop Valve
3/8" Compression Nut
Remove 3/8" compression nut/sleeve from the
hot and cold supply stop valves. Connect 3/8"
E
end of flexible supply hose to 3/8" compression
on supply stop valve. Ensure hot and cold supply
hoses are connected to hot and cold supply stop
valve. For TL option, only connect cold supply.
Attach 1/4" supply tube from
the LH WashBar to the 1/4"
supply valve outlet. Loosen the
compression nut on the valve
C
body. Push the 1/4" supply tube
firmly into the tube connector
until it is fully seated. Tighten
the compression nut by hand.
Repeat this step for Center and
RH WashBar supply tube.
16
Cold Supply/
Stop Valve
1/4" Supply
Tube for Center
WashBar
2/4/2019
D
1/4" Supply
Tube for LH
WashBar
1/4" Supply Tube
for RH WashBar
Bradley • 215-1844 Rev. E; ECN 18-08-023
For thermostatic mixing valve
installation, secure 1/2" supply hose
to hot water supply valve inlet. Secure
the other supply hose from cold water
supply to cold water supply valve inlet.
Secure valve to wall using (2) #10
fasteners (provided by installer).
For tempered line installation, secure
1/2" supply hose to tempered water
supply and TL valve inlet (not shown).
Secure valve to wall using (2) #10
fasteners (provided by installer).
Cable Extension for LH
WashBar Connects Here
No Cable Extension Needed
for Center WashBar
Cable Extension for RH
WashBar Connects Here
Installation

Publicidad

loading

Este manual también es adecuado para:

Verge lvq serie