Descargar Imprimir esta página

Bradley Verge LVQD3 Instalación página 17

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
12
Soap Installation
A
Attach soap supply tube from the
WashBar to the top of the soap pump.
B
Attach soap pump with supply tubes
attached into gallon jug.
Slide gallon jug with soap pump into
soap motor control box. Ensure soap
C
pump flange is positioned below motor
control box lever. Gallon jug should rest
on soap container bracket without soap
pump pulling off of container.
Use the hook and loop cable tie
provided to secure container to soap
bracket. Feed end of cable tie (smooth
D
side facing you) through the right side
slot of bracket flange at top. Feed
through left side flange slot and wrap
around jug. Secure with hook and loop
end.
Ensure that the soap tube is not
F
kinked. Position hand above soap
motor control box and adjust tube if
needed.
To manually prime the soap, press
G
down on the control box lever arm 6
to 8 times.
For ease of soap container
removal, pull tank while rotating
bottom of tank out.
Bradley • 215-1844 Rev. E; ECN 18-08-023
Top Flange
Cable Tie Slot
The soap system is designed to be used with a standard
U.S. gallon soap container. For accurate low soap
indication, user needs to set soap type (see configuration
mode at the end of this manual on how to set soap type).
Soap cycle count defaults to liquid soap configuration. If
you have the foam soap option, please see Setting the
Soap Type under Configuration Mode towards the end of
this manual.
2/4/2019
LVQD3
Attach Soap Supply Tube Here
Soap Pump
Ensure Soap Pump
Flange is Positioned
Below Control Box Lever
Cable Tie Hook
and Loop Strap
Soap Container
Bracket
17

Publicidad

loading

Este manual también es adecuado para:

Verge lvq serie