Descargar Imprimir esta página

Hansgrohe AXOR Starck 10133 1 Serie Instrucciones De Instalación página 6

Ocultar thumbs Ver también para AXOR Starck 10133 1 Serie:

Publicidad

red
rouge
rojo
6
English
For proper operation of the faucet, the hot supply
must be on the left, and the cold supply must be
on the right.
Installation
Starck only
Remove the valve mounting nuts from the valves.
Push the valves up into the holes. Install the
mounting nuts on the valves.
Tighten the tensioning screws.
Place the handles over the valve mounting nuts.
Tighten the handles by rotating the escutcheons
clockwise.
The handles should be parallel to the basin.

Publicidad

loading