ASSEMBLY ONTO THE BOILER
Fix flange 2 to the boiler using 4 screws 3 interposing the insulation gasket 4 and the possible insulating cord 5. Insert the
burner in the flange so that the draught tube penetrates into the combustion chamber by the length suggested by the boiler
manufacturer. Tighten screw 1 to lock the burner in position.
FLAME DIMENSIONS
The dimensions are indicative only being influenced by:
- excessive quantity of air;
- combustion chamber shape;
- development of gas path in the boiler (direct/reverse);
- combustion chamber pressure.
A Flame diameter
B Flame length
C Test tube diameter
D Test tube length
- 30
-