Descargar Imprimir esta página

Tripp-Lite SR42UBCL Manual Del Propietário página 6

Ocultar thumbs Ver también para SR42UBCL:

Publicidad

Idiomas disponibles

Idiomas disponibles

4. Enclosure Installation
4
In order to secure the cabinet to the building structure for stability, attach the 2 shipping brackets
using the hardware that attached the enclosure to the shipping pallet. Use a 13 mm open-end
wrench to connect the brackets to the outer
enclosure. Attach the brackets to secure mounting points in the floor using user-supplied hardware
or Tripp Lite's SmartRack Bolt-Down Kit (Part # SR331).
4.5 Ground Connection
All the parts of the enclosure should be grounded to the frame of the enclosure. Use the enclosure's
front or rear threaded grounding point
enclosure directly to your facility's earth ground connection with an 8 AWG (3.264 mm) wire (not
included). Route the ground wire under the enclosure's frame to ensure unhindered door operation.
WARNING: Attach each enclosure to earth ground separately. Do not use the enclosure
without an earth ground connection.
5. Enclosure Configuration
5.1 Adding or Removing Front and Rear Doors
5.1.1 Removing Doors
1
Disconnect the door's ground wire.
2
Open the door until it is perpendicular (90 degrees) to the front of the enclosure.
3
Lift the door from the hinges and remove it from the enclosure.
5.1.2 Reinstalling Doors
To Reinstall Doors, Reverse Steps 1-3
(Optional) If the enclosure is joined to another enclosure, turn the door back toward the enclosure as you lift it from the hinges.
A
or inner
B
bracket mounting points of the
A
and an M6 screw (not included) to connect the frame of the
A
4
1
2
3
6
B
A
EARTH
GROUND
90°

Publicidad

loading

Este manual también es adecuado para:

Sr48ubclAgac7761Agac7454