Descargar Imprimir esta página

GRE BAMBU2 Manual De Instrucciones página 56

Publicidad

ASSEMBLY OF THE COLUMNS
1
• Assemble 8 columns with parts 1PV1335 + 1 PG + 4 PEAO + 2PEU2 using the TV bolts.
NOTE: THE NUTS SHOULD ALWAYS BE LOCATED ON THE INSIDE. THE ENTIRE PROCESS SHOULD BE
CARRIED OUT ON FIRM AND LEVEL GROUND, BEFORE EXCAVATING THE FOUNDATIONS. WE RECOMMEND
ASSEMBLING THE PARTS IN A LARGE AND LEVEL SPACE, TO MAKE IT EASIER.
1
Place the part PEU2 so that the four open holes on the sides with the second and third line of holes of the PG (see
diagram 1b) and that the side where the holes are rests on the upper part. Bolt the TV bolts when the PEAO parts have
been installed.
Bolt the two PEAO parts on each side of the PG crossbar, using the TV bolts and a spanner no. 13.
2
3
Place the other PEU2 part on the lower part of the PV1335. Fix the column PV1335 to the PG beam bolt the TV bolts
across the PEAO.
1x
=
1 PV1335 + 1 PG + 4 PEAO + 2 PEU2 + 1PEU
56
2
3
E
Ref. KPBOC5352
x2
x2

Publicidad

loading

Este manual también es adecuado para:

Macadamia2Kpboc5352Kpboc6322