Descargar Imprimir esta página

GRE BAMBU2 Manual De Instrucciones página 58

Publicidad

A
DIRECTLY ON THE GROUND
C
Z
A
We recommend you assemble the pool between two or three persons and on a wind-free day. The use of gloves for the
installation is recommended for safety. THE ENTIRE PROCESS SHOULD BE CARRIED OUT ON FIRM AND LEVEL
GROUND, BEFORE EXCAVATING THE TRENCHES
EXCAVATION OF THE TRENCHES (Z) FOR THE COLUMNS (C).
Dimension of the foundations: ZA = 426cm
The distance between them is 110cm.
(*)
C
Z
A
426cm
Z
C
426cm
Trenches
Columns
20cm
58
KPBOC6322
Z
110cm
IMPORTANT: When excavating
the foundations, the rectangular
space reserved for situating
the AP that should be buried 5
cm and transversally fixed with
their respective PG should be
excavated(*). All the structural
system should be perfectly levelled
(columns and internal structure,
beams).

Publicidad

loading

Este manual también es adecuado para:

Macadamia2Kpboc5352Kpboc6322