Descargar Imprimir esta página

Ecoflam MAX GAS 170 PAB Manual Del Usuario página 11

Ocultar thumbs Ver también para MAX GAS 170 PAB:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 63
Function
- TCG 2xx control box
Operating cycle phases:
1: No voltage
2: Powering up, no heat request
3: Checking the air flap is closed
4: Opening an air flap, arrival in pre-
ventilation position.
5: Checking the rest status of the air
pressure switch.
6: Pre-ventilation: energizing of the
motor, checking the air pressure.
7: End of pre-ventilation.
8: Air flap closes to the ignition position
9: Switching on the igniter, unauthorised
flame monitoring.
10:Starting the burner: Opening of the
420010029201
solenoid valve, flame formation,
safety time: max. 3 s.
11:Awaiting regulator release
12:Opening the air flap, until the opening
position of the 2nd stage valve is
reached.
13:Operation in 2nd stage
14:Closing the air flap, until the 2nd
stage valve reaches the closed
position.
15:Operation in 1st stage
16:Regulator shutdown, closure of the
air flap to 0°.
17:Awaiting a new heating request
www.ecoflam-burners.com
EN
11

Publicidad

loading

Este manual también es adecuado para:

Max gas 250 pab