Descargar Imprimir esta página

Beko BHCB61632XH Manual Del Usuario página 13

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 18
5
Installation of appliance
5.3 Wall mounting
Wall must be flat, straight and have the suffi-
cient bearing capacity.
Depth of drilling holes must comply with the
length of bolts.
The bolts and dowels provided are suitable
for brick walls. For other construction material
(e.g. drywall, plate, porous concrete), suitable
fixing dowels and nuts shall be used.
(Figure 1)
CAUTION: Before drilling, ensure
A
that there are no power, gas or wa-
ter pipes in the close proximity of the
drilling locations.
Draw a mid location line from the ceiling perpen-
dicular to the lower edge of the hood.
Fix the assembly scheme on the wall. For points
A and B, take the maximum dimensions of the
hood as reference, and drill points A and B you
have marked with a Ø6mm drill bit, and tap Ø6mm
plastic wall plugs. Install the chimney connection
plate to the wall with 2 pieces of 3.9x22 screws
(Figure 2).
Cooker Hood / User Manual
To install the hood body, drill points C,D,E speci-
fied in the installation template with a Ø10mm drill
bit and tap Ø10mm plastic dowels to these points
(Figure 2).
Install 2 pieces of 5.5x60 mounting screws to
points C and D with a clearance of 5 mm between
the screw head and the wall (Figure 2).
(Figure 2)
Install two pieces of hanging plates to the body of
the hood with M5x35 mounting screws (Figure 2).
(Figure 3)
Hold the cooker hood by its body and place it on
the mounting screws on the wall and tighten the
screws (Figure 3).
1
2
13 / EN

Publicidad

loading