PLUMBING - GRAVITY DRAIN
B: Floor Drain Located Off to the Side or Back of
the Unit (not directly under the unit)
1. Place the unit (ice machine) in front of the
installation opening. Adjust leveling legs to the
appropriate height.
2. Remove the left side (when facing the product)
access panel to the drain connection.
plastic) through the hole in the lower back
panel. Connect tubing to the barbed elbow
and secure with a clamp. NOTE: Tubing and
clamp are not included and must be purchased
separately.
4. Take care in measuring the amount of tubing
needed to reach the floor drain and cut to
desired length. NOTE: Ensure there is enough
tubing to reach the drain but not too much
to kink or bunch up when unit is moved into
position.
5. Reinstall the access panels.
Water Supply
The recommended water supply line is part
number WX08X10006G. and is available at
GEApplianceparts.com or by calling 877-959-
GEAppliances.ca or call
800.561.3344.
the supply and the unit. This shut- off valve should
not be installed behind the unit.
The water connection is at the back of the cabinet.
When built in: Coil enough tubing behind the
machine so it can be pushed into the cavity without
kinking the tubing.
Connect water
supply here.
49-1000610 Rev. 2
Installation Instructions
(cont)
TOE KICK LOCATION
The toe kick can be adjusted to help align with your
cabinets. The toe kick comes installed in the inward
position. To move the toe kick to the outward position:
1. Loosen the screws on both sides as shown to
remove the metal toe kick.
2. Loosen the 2 long screws in front and remove the
plastic frame.
onto the posts on the rear of the frame as shown.
4. Re-install the plastic frame using the 2 long
screws.
5. Re-install the metal toe kick using the 2 screws
in the side. The toe kick can be adjusted up and
down to your desired position.
19