5
Installation
5.1
Notes on safety for the installation
After carefully cleaning all around the area where the burner is to
be installed, and arranging for the environment to be illuminated
correctly, proceed with the installation operations.
All the installation, maintenance and disassembly
operations must be carried out with the electricity
supply disconnected.
DANGER
5.2
Instructions to avoid burnout or bad combustion of the burner
1
The burner can not be installed outside as it is suitable for
operation in closed rooms only.
2
The premises the burner operates in must have openings
for the air need for the combustion.
To be sure about this, you have to control CO 2 and CO in
the exhaust gases with all the windows and doors closed.
3
If there are air extractors in the premises the burner works,
make sure that there are openings for air to be taken in that
5.3
Handling
The transport weight is given in chapter 4.3 page 8.
Observe the permissible ambient temperatures for storage and
transport: -20 ..... + 70 °C, with max. relative humidity. 80%.
After positioning the burner near the installation
point, correctly dispose of all residual packaging,
separating the various types of material.
Before proceeding with the installation operations,
carefully clean all around the area where the burn-
er will be installed.
CAUTION
The operator must use the required equipment
during installation.
20138077
Installation
The installation of the burner must be carried out
by qualified personnel, as indicated in this manual
and in compliance with the standards and regula-
tions of the laws in force.
WARNING
Combustion air inside the boiler must be free from
hazardous mixes (e.g.: chloride, fluoride, halo-
gen); if present, it is highly recommended to carry
out cleaning and maintenance more frequently.
DANGER
are big enough to ensure the required air change; In any
case, check that when the burner stops the extractors do
not draw hot fumes from pipes through the burner.
4
When the burner is stopped, the flue must be kept open and
a natural draft created in the combustion chamber.
If the smoke pipe is closed, the burner must be drawn back
till the extraction of blast tube from the furnace. Before oper-
ating in this way take the voltage off.
12
GB