Descargar Imprimir esta página

Riello RG1RKD Instrucciones De Instalación, Uso Y Mantenimiento página 26

Publicidad

Idiomas disponibles

Idiomas disponibles

6.5
Electrical diagram
20148674
KEY TO LAY-OUT:
B5
- 2nd stage operation signal (230V
C
- Capacitor
E
- Electrode
F
- Flame sensor
h..
- Hour counter (230V
K
- Thermostat enabling start-up after
preheating
PH - Oil heater
MV - Motor
RS - Remote reset
S3
- Remote lockout signal (230V
SER - Safety lockout device
T6A - Fuse
TB - Burner earth
TL
- Limit thermostat
TR - Adjustment thermostat
TS
- Safety thermostat
V1
- Oil valve 1st stage
V2 -
Oil valve 2nd stage
X..
- Plug
XP.. - Socket
20138077
Start-up, calibration and operation of the burner
Master
switch
230V ~ 50Hz
~
- 0.1A max.)
~
- 0.1A max.)
~
- 0.5A max.)
TO BE DONE BY
BY THE INSTALLER
 Do not invert the neutral with the phase in the
electrical supply line.
 Check that the electrical supply of the burner
corresponds to that shown on the identifica-
WARNING
tion label and in this manual.
 The section of the conductors must be at
least 1 mm
local standards and legislation).
 Connect the 2nd stage thermostat (TR) to the
terminals T6 - T8 removing the jumper.
Test the burner by checking the shut-down of the
burner by opening the thermostats and the lockout
by blocking out the flame sensor.
WARNING
If the cover is still on, remove it and proceed with
the electric wiring following the wiring diagrams.
Use flexible cables in compliance with EN 60 335-
CAUTION
1 standards.
24
GB
2
. (Unless requested otherwise by
Fig. 22

Publicidad

loading

Este manual también es adecuado para:

3736654