ASSEMBLY
WET/DRY VAC ASSEMBLY (Fig. 4)
1. Align the front of the Powerhead Assembly (A) with
the Vac Inlet Port located on the front of the Dust
Drum (B), as shown.
2. Place the Powerhead Assembly (A) on top of the
Dust Drum (B).
3. Ensure the Powerhead Assembly (A) completely
covers the top of the Dust Drum (B) so leakage
does not occur.
4. Rotate the Drum Latches up and over the Powerhead
Assembly Hooks to engage the Two Latches.
5. To remove the Powerhead Assembly, reverse the
above directions.
Powerhead
Assembly Hook
Drum Latch (2)
Vac
Inlet Port
CARRY HANDLE/POWER CORD WRAP
ASSEMBLY (Fig. 5)
1. Locate the Carry Handle/Power Cord Wrap (C) and the
Two #10 x 3/4" Pan Head Screws (D) in loose parts
bag.
2. Position the Carry Handle/Power Cord Wrap (C) on top
of the Powerhead Assembly (A), as shown.
3. Insert a #10 x 3/4" Pan Head Screw (D) through the
Hole at each end of the Carry Handle/Power Cord
Wrap (C) and into the Powerhead Assembly (A).
Tighten securely.
ATTACHING AND REMOVING VACUUM HOSE
(Fig. 6)
1. To Insert Hose: Locate the end of the Tug-A-Long
Positive Locking Hose with Dual-Flex (E) and align it
with the Vac Inlet Port. Push the Hose cuff straight
into the Vac Inlet Port until it snaps into place.
2. To Remove Hose: Press the Hose Locking Tab and
pull the Hose end straight out of the Vac Inlet Port.
Fig. 4
(A)
(B)
Screw (2)
Fig. 5
(D)
Carry
Handle
(C)
Power
Head
(A)
Assembly
5
INSERT HOSE
REMOVE HOSE
Fig. 6
Vac Inlet
Port
Hose
Locking
Tab
(E)
(B)