The Bead Mill 4 must be shipped in its original packaging.
1.
2.
1.
Transporting the Bead Mill
Before transporting please follow this steps.
2.
Remove all tubes, cover the unit in its plastic bag.
The tube carriage will slide back. Lift the tube carriage to
align the motor mount holes to the holes in the base plate.
Insert screws until you feel them engage (It may take some
finesse to get them aligned with the internals of the unit).
Tighten screws until completely seated.