Descargar Imprimir esta página

Salicru EQUINOX SLC EM Lite Manual De Usuario página 64

Publicidad

Idiomas disponibles

Idiomas disponibles

6.2.3.2. General wiring diagram SLC EM single-
phase with Zero Injection.
This diagram shows the wiring structure and composition of the
SLC ENERGY MANAGER device for the
phase inverter, with zero injection. The installation and wiring must
comply with local standards.
ICP
Legend abbreviations:
ICP
– Power control switch.
IGA
– Main circuit breaker.
ID
– Differential switch.
MCB
– Magnetic Circuit Breaker.
CNT
– Contactor.
Fus.
– Fuses.
SPD
– Surge Protection Device.
PIA
– Small circuit breaker.
PV
– Photovoltaic panels.
SLC ENERGY MANAGER
monitoring and control device.
In order not to overload the dia-
gram, the earth cables have
only been represented at the earthing
connection points of the protection
devices, the inverter and the battery
system.
64
EQX2-S/SX
series single-
SLC ENERGY
MANAGER
IGA
CTs
– Energy
Fus.
SPD
PIAs
ID
CNT
ID
MCB
Inverter
SALICRU

Publicidad

loading

Este manual también es adecuado para:

Equinox slc emEquinox slc em t