Descargar Imprimir esta página

Sime AQUA HE 25 ErP.BE Instrucciones Para El Instalador página 75

Publicidad

Idiomas disponibles

Idiomas disponibles

2
INSTALLATION
2.1
BOILER ROOM
The. boilers. with. a. rating. of. more.
than. 35. kW. must. be. equipped. with.
a.technical.room.whose.dimensions.
and.requirements.correspond.to.the.
current.standards.and.regulations..
The.minimum.distance.between.the.
walls. of. the. room. and. the. boiler.
must.not.be.less.than.0.60.m.,.while.
the. minimum. height. between. the.
AQUA HE 25 ErP.BE
AQUA HE 35 ErP BE
top. of. the. boiler. and. the. ceiling.
must. be. at.least. 1. m..which.can. be.
reduced. to. 0.50. m.. for. boilers. with.
incorporated. heaters. (however. the.
minimum. height. of. the. boiler. room.
must.not.be.less.than.2,5.m)..
The.boilers.with.a.rating.of.less.than.
35. kW. can. be. installed. only. in. per-
fectly.air-vented.rooms..
To.circulate.air.in.the.room,.air.vents.
must. be. made. on. the. outside. walls.
2
bar
1
3
0
4
OPEN
which. satisfy. the. following. require-
ments:
–..Have. a. total. surface. area. of. at.
least.6.cm
of. thermal. capacity. and. however.
not.less.than.100.cm
–..To.be.situated.as.close.as.possible.
to. the. floor,. unobstructable. and.
protected. by. a. grate. which. does.
AQUA HE 25 INOX ErP.BE
AQUA HE 35 INOX ErP BE
2
.for.each.installed.Kw.
2
.
2
bar
1
3
0
4
Fig..4
75

Publicidad

loading

Este manual también es adecuado para:

Aqua he 35 erp beAqua he 25 inox erp.beAqua he 35 inox erp be