Installation
07. Remove the extractor hood. Drill the
4 lower 8 mm ø fixing holes and press
in the wall plugs flush with the wall.
376
74
160
08. Attach the extractor hood and screw
into position with the remaining
4 screws.
09. Stick protective film over the holes of
the 2 lower mounting bolts in the
protective grid.
10. Connect up the air outlet pipe.
11. Connect the hood to the electricity
supply.
28
2.
1.
12. Remove the protective film from the
two flue ducts.
Avoid damage to the sensitive
surface.
13. Insert the upper flue duct (slots
downwards) into the lower flue duct.
Protect the cover panels from
scratches, for example by laying the
template used for marking the wall over
the top edge of the lower section.
14. Insert the complete flue duct at an
angle and swivel to the rear.
3.
1.
2.
15. Carefully pull the upper flue duct
upwards and screw the sides to the
fixing bracket with 2 screws.
16. Insert the grease filter (refer to
Operating Instructions).