Descargar Imprimir esta página

Samsung NX58H5600S Serie Manual Del Usuario página 37

Ocultar thumbs Ver también para NX58H5600S Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

Step 9. Final installation checklist
You have just completed installing your range. Make sure all controls are in the off
position and the flow of ventilation air to the range is unobstructed. The following
is a checklist to confirm your range is safely installed and ready for operation.
-
Gas line has been properly connected to the range.
The gas has been turned on. All connections have been
checked for leaks.
-
Range is plugged into the properly grounded electrical
receptacle.
-
Approved anti-tip bracket is properly installed and engaged with the range.
-
Range is leveled and is firmly sitting on a solid,
level floor.
-
Gas surface burners have been properly
assembled.
-
All burners have been tested for proper
operation.
-
FOR INSTALLER ONLY—Check and/or adjust
the broil and oven burner flames as described on
page 37 in this manual.
Locking screw
installation instructions _37
Gas Range
Plug

Publicidad

loading

Este manual también es adecuado para:

Nx58h5650w serieNx58j5600s serieNx58m5600s serie