Descargar Imprimir esta página

Dreame R20 Manual Del Usuario página 12

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 98
Installation
EN
2-in-1 Charging & Storage Mount Installation Diagram
1. The bottom of the mounting template sticker should be level and at least 115 cm from
the ground. The top should have at least 30 cm* of clearance above it.
2. Use a power drill with an 8 mm drill bit to drill a hole into each marker on the mounting
template sticker, then insert a wall plug into each hole.
3. Align the locating holes on the mount with the holes on the wall. Fasten it to the wall
with the included screws.
*30 cm: Leave enough space just in case you may need to purchase the replaceable
battery in the future.
Note:
• The 2-in-1 charging & storage mount is an optional accessory. You can install it based on
your needs.
• The 2-in-1 charging & storage mount should be installed in a cool, dry place with an
electrical outlet nearby. Prior to installing, ensure that there are no electrical wires or
pipes in the space directly behind where the mount will be installed.
7
30 cm
115 cm

Publicidad

loading

Este manual también es adecuado para:

Vtv97a