Descargar Imprimir esta página

Bombard TYPHOON 285 Manual Del Propietário página 34

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

1. Deflate the boat (remember to hold the valve insert on the high pressure inflatable floor so
that it doesn't fly off).
2. Replace the valve protections.
3. Remove the floorboard. (For the TYPHOON Aero, it is not necessary to remove inflatable
floor to fold the boat).
4. Empty the boat of all water and sand by opening the self-bailers, dry it.
5. Fold in the 2 sides of the main buoyancy tube (A), fold the cones onto the transom, then
roll up the boat around the transom (C). Start again if you feel there is still some air left in
the tubes.
buoyancy tube
tube deflated
Stow the boat in its bag as follows (D):
. Stow the boat folded on its bag open (back side of the bag visible).
. Position the floor sections and stringers flat on the boat (except Aero models), then the
oars dismantled.
. Close the bag and fasten the two front straps.
. Tight the side ropes (make sure that all equipment stays inside).
. To finish, store the foot-pump in the front pocket.
DEFLATING / FOLDING THE BOAT
A
floor
C
D
12
/ 10
B

Publicidad

loading