Descargar Imprimir esta página

NEFF D 96T5N0 Instrucciones De Uso Y Montaje página 27

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 68
Installation
This extractor hood is intended to be
mounted onto the kitchen wall.
1. Remove the grease filter (refer to
Operating Instructions).
2. Draw a line on the wall from the ceiling
to the lower edge of the hood at the
centre of the location where the hood is
going to be mounted.
3. Use the template to mark the points on
the wall where the screws will be moun-
ted. In order to make it easier to hook
the hood onto the screws, draw the out-
line of the area where the hood will be
attached.
Ensure that the minimum distance
between the hob and the extractor hood is
maintained – 550 mm for an electric hob
and 650 mm for a gas hob. The bottom
edge of the template equates to the lower
edge of the extractor hood.
4. Drill 5 x l 8 mm holes for the extractor
hood and 2 x l 8 mm holes for the
chimney panelling. Insert plugs into the
holes so that they are flush with the wall.
205
389
80
mind.550 Elektro
mind.650 Gas
Note: Take into account any special
accessories that are going to be fitted.
5. Attach the fixing bracket for the
chimney panelling using two hexagon
head cap screws.
6. Screw in the middle screw (button-
headed screw without plain washer) to
approx. 5 mm as an assembly aid for
the extractor hood fixture.
7. Hook the extractor hood over the screw
in the wall.
ca.5mm
27

Publicidad

loading