Descargar Imprimir esta página

Bosch DKE 65 Serie Instrucciones De Uso Y De Montaje página 24

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 58
Installation
08. Screw in the four hexagon head cap
screws with plain washers.
Before the 4 screws are
tightened down, align the extractor
hood properly.
If any pressure is exerted on the
glass screen when tightening the
screws it could lead to glass breakage.
09. Stick protective film over the holes of
the 2 lower mounting bolts in the
protective grid.
10. Connect up the air outlet pipe.
11. Connect the hood to the electricity
supply.
12. Remove the protective film from the two
flue ducts.
Take care not to damage the
stainless steel surfaces which are
susceptible to scratches etc.
24
2.
1.
13. Insert the upper flue duct (slots
downwards) into the lower flue duct.
Protect the cover panels from
scratches, for example by laying the
template used for marking the wall over
the top edge of the lower section.
14. Insert the complete flue duct at an
angle into the glass shield and swivel
backwards.
Warning: The holes in the flue duct
must be positioned exactly over the
switches.
3.
1.
2.
3
15. Carefully pull the upper flue duct
upwards and screw the sides to the
fixing bracket with 2 screws.
16. Insert the grease filter (refer to
Operating Instructions).
P

Publicidad

loading

Este manual también es adecuado para:

Dke 75 serieDke 95 serie