Make coffee
Open the top cover, and pour proper drinking water into water tank according to the
gauge. Then close the tank cover.
Place the funnel into the funnel support, and make sure it is assembled correctly. Put the
filter correctly.
Add coffee powder into filter with measuring spoon, a spoon coffee powder can make a
cup of top-grade coffee, but you can adjust according to the taste yourself.
Close the top cover, and then insert the carafe on keeping warm plate horizontally.
Plug the power cord into the outlet, press the ON/OFF button to "I" position, the indicator 3
will be illuminated. The appliance will begin working. You may stop to brew by turning off
the ON/OFF button at any time.
Note: at any time, you can take out carafe to serve but the time cannot exceed 30 seconds.
When the process is finished, if you do not want to serve immediately, keep the switch on,
the coffee can be kept warm in the keeping warm plate until the power is cut off manually.
For an optimum coffee taste, serve it just after brewing.
Pre-heating
To make a cup of good hot espresso coffee, we recommend you preheating the appliance
before making coffee, including the funnel, filter and cup, so that the coffee flavour can
not be influenced by the cold parts.
Open the top cover, and fill the tank with desired water according to the gauge. Replace
the top cover.
Set steel mesh into metal funnel, pull the press bar backward, make sure the tuber on the
funnel aligns with groove in the appliance, then insert the funnel into the appliance from
the "Insert" position and release the press bar, and you can fix them into coffee maker
firmly through turn it anticlockwise until it is at the lock position. (See fig. 1).
Place the small carafe on removable shelf.
Then connecting the appliance to power supply source. Make sure the steam controller is
on the off position.
Press ON/OFF switch to the "I" position, the indicator 1 is illuminated. The coffee maker
begins to be pre-heated.
When the indicator 2 is illuminated, you should press the pump switch on the "I" position,
there will be hot water flowing out. When the indicator 2 is extinguished, close the pump
switch. The pre-heating is finished.
Make espresso
Remove the metal funnel by turning it in clockwise. Add coffee powder to steel mesh with
measuring spoon, a spoon coffee powder can make about a cup of top-grade coffee, then
press the coffee powder lightly with the tamper and remove the redundant coffee powder
on the edge. Set steel mesh into metal funnel. Pour out the hot water in the small carafe.
Then place the hot small carafe on removable shelf. At the time, indicator 2 is illuminated,
if indicator 2 is extinguished, wait for a moment, once indicator 2 is illuminated, you
should turn on the pump switch, and waiting for a moment, there will be coffee flowing
out.
Note: During operation, if indicator 2 is extinguished, you must close the pump switch and
stop to make espresso coffee. After a few seconds, if indicator 2 is illuminated again, you
can make espresso coffee continued by turning on the pump switch, the indicator 2 is
cycle on and off to maintain the water temperature is hot enough.
INSERT
LOCK
17