OPERATION
MACHINE COMPONENTS
3
11
5
6
8
7
1. Control Handle
2. Handle Height Adjustment lever
3. Safety Lock Button
4. On/Off Levers
5. Power Cord
6. Power Cord Storing Hook
7. Transport Wheels
8. Dust Bag Housing
9. Pad Pressure Adjustment Knob
10. Pad Pressure Meter
11. Circuit Breaker Reset Button
12. Base
13. Dust Control Skirt
10
1
4
2
10
9
12
13
Home Find... Go To..
MACHINE SETUP
Carefully check carton for signs of damage. Report
damages at once to carrier.
INSTALLING PAD
FOR SAFETY: Before leaving or servicing
machine, unplug cord from wall outlet.
1. Select and install a recommended high speed
burnishing pad intended for 2000 rpm.
NOTE: Consult your authorized distributor for pad
recommendations. Use only manufacturer supplied or
approved pads.
2. Pull the handle height adjustment lever and raise
the handle to the upright position. Carefully tilt the
machine backwards and rest the handle on the
floor (Figure 1).
FIG. 1
3. To install the pad, remove the plastic centerlock
ring from the pad driver by turning it counter-
clockwise. Position the pad on the pad driver and
replace centerlock ring by turning it clockwise.
Make sure the centerlock ring is fastened securely
(Figure 2).
FIG. 2
4. After installing pad, return the machine to the
upright position.
UltraShinet Burnisher (06–03)