Descargar Imprimir esta página

Neptun BLUE LINE NPGP 4100 Manual De Instrucciones Original página 12

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 24
Anleitung_NPGP_4100_SPK7__ 11.03.13 08:05 Seite 12
GBR
8.3 Ordering replacement parts:
Please quote the following data when ordering
replacement parts:
Type of machine
n
Article number of the machine
n
Identification number of the machine
n
Replacement part number of the part required
n
For our latest prices and information please go to
www.isc-gmbh.info
9. Storage
Store the equipment and accessories out of children's
reach in a dark and dry place at above freezing
temperature. The ideal storage temperature is
between 5 and 30 °C. Store the electric tool in its
original packaging.
If the pump is not going to be used for a long time
n
or has to be removed for the winter months, rinse
it out with water, empty it completely and allow it
to dry.
The equipment must be completely drained
n
before it is subjected to frost.
After long stoppages, make sure the rotor turns
n
correctly by briefly switching the pump on and off.
10. Disposal and recycling
The unit is supplied in packaging to prevent its being
damaged in transit. This packaging is raw material
and can therefore be reused or can be returned to the
raw material system.
The unit and its accessories are made of various
types of material, such as metal and plastic. Defective
components must be disposed of as special waste.
Ask your dealer or your local council.
12

Publicidad

loading

Este manual también es adecuado para:

41.822.76