Descargar Imprimir esta página

SICK Smart Light Tower SLT060-0B010J700 Instrucciones De Operación página 31

Ocultar thumbs Ver también para Smart Light Tower SLT060-0B010J700:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 48
6
Mounting
6.1
Scope of delivery
6.2
Mounting requirements
6.3
Notes on mounting
6.4
Mounting on the machine housing
8026183.1FJ5/2022-11-17 | SICK
Subject to change without notice
Display
Green LED flashes
off
SLT
Quickstart
For the typical space requirements for the device, see the type-specific dimen‐
sional drawing,
see "Technical data", page
Comply with technical data, such as the permitted ambient conditions for opera‐
tion of the device (e.g., temperature range, EMC interference emissions, ground
potential).
To prevent condensation, avoid exposing the device to rapid changes in tempera‐
ture.
Protect the device from direct sunlight.
Only mount the device using the threaded mounting holes provided.
Shock and vibration resistant mounting.
The following requirements are necessary for proper installation:
Switch off the voltage supply before you mount or replace the devices.
Do not apply excessive force when mounting/dismounting the signal lamp and
buzzer unit.
Perform installation on a rugged, level surface.
Install this device where there is no excessive vibration.
Note the maximum permissible tightening torque for the device of 4.5 Nm.
NOTE
This product comes with a waterproof foil on the bottom of the bracket (1 mm).
This must be used during installation. We recommend, however, applying sealant
between the device and the installation surface to guarantee the watertightness
of the device if there are any irregularities present in the installation surface.
If sealing from the nut side (interior of the machine) is required, apply a suitable
sealing compound for the M30 nut to the
Unscrew the M30 nut on the bottom of the signal lamp. Insert the bottom part of the
signal lamp through the mounting surface and secure the lamp to the machine using
the M30 nut and 4.5 Nm tightening torque.
Attachment of the connection cable is described in
OPERATING INSTRUCTIONS
Description
IO-Link connection active
- Device not ready
- No voltage
- Voltage below the limit values
44.
/
-inch NPT thread.
1
2
"Electrical installation", page
O P E R A T I N G I N S T R U C T I O N S | SLT
en
33.
31

Publicidad

loading

Este manual también es adecuado para:

Smart light buzzer slb060-0b010k70060759386076072