6.2
Connecting the device
Material
Requirements:
•
The system has been de-energized and secured against being switched on again.
•
The connections for the voltage supply and signal processing have been correctly prepared.
Procedure:
1. Insert the connecting cable (1)
into the M12 plug connector (2).
2. Screw the union nut (3) on the
connecting cable.
Tightening torque: 0.2 Nm
3. Remove the protective film from the display.
The device is ready for operation as soon as the voltage supply is established.
6 Electrical connection
Connecting cable, "Electrical data ", Page 9
15