Enclosure Installation
3
After lowering each leveler, use the carpenter's level to confirm
that the enclosure is level in all directions. Adjust the levelers as
required until the enclosure is level.
4
In order to secure the cabinet to the building structure for stability,
attach the 2 shipping brackets using the hardware that attached the
enclosure to the shipping pallet. Use a 13 mm open-end wrench to
connect the brackets to the front and rear bracket mounting points
of the enclosure. Attach the brackets to secure mounting points in
the floor using user-supplied hardware or Tripp Lite's SmartRack
Bolt-Down Kit (Model: SRBOLTDOWN).
Ground Connection
All the parts of the enclosure are grounded to the frame of the
enclosure. Use the enclosure's bottom panel with marked M6 grounding
stud and user-supplied ground wire to connect directly to your facility's
earth ground connection. Route the ground wire through the brushes
in the panel under the enclosure's frame to ensure unhindered door
operation. WARNING: Attach each enclosure to earth ground
separately. Do not use the enclosure without an earth ground
connection.
3
4
8
EARTH
GROUND