the Weller KHE / KHE 81 Stop + Go Rest. Production was based
EN
on stringent quality requirements which guarantee the perfect
English--KHE
operation of the device.
Thank you for placing your trust in our company by purchasing
the Weller KHE / KHE 81 Stop + Go Rest. Production was based
1. Caution!
on stringent quality requirements which guarantee the perfect
operation of the device.
Please read these Operating Instructions and the attached
Safety Information carefully prior to initial operation. Failure to
observe the safety regulations results in a risk to life and limb.
1. Caution!
Please read these Operating Instructions and the attached
The manufacturer shall not be liable for damage resulting from
Safety Information carefully prior to initial operation. Failure to
misuse of the machine or unauthorised alterations.
observe the safety regulations results in a risk to life and limb.
The Weller KHE / KHE 81 Stop + Go Rest corresponds to the EC
The manufacturer shall not be liable for damage resulting from
Declaration of Conformity in accordance with the basic safety
misuse of the machine or unauthorised alterations.
requirements of Directives 2004/108/EEC, 2006/95/EEC and
2011/65/EU /(RoHS).
The Weller KHE / KHE 81 Stop + Go Rest corresponds to the EC
Declaration of Conformity in accordance with the basic safety
2. Description KHE / KHE 81
requirements of Directives 2004/108/EEC, 2006/95/EEC and
2011/65/EU /(RoHS).
The KHE / KHE 81 Stop + Go Rest is a switch-off and follow-up
control for the WFE soldering fume extraction device.
The soldering iron rest has a zero-voltage guide connection to
2. Description KHE / KHE 81
the control unit. In rest KHE 81, the light signal is transmitted to
The KHE / KHE 81 Stop + Go Rest is a switch-off and follow-up
the control unit by an LED. In the case of rest KHE, the light inlet
control for the WFE soldering fume extraction device.
is located in the holder funnel.
The soldering iron rest has a zero-voltage guide connection to
The solder fume extractor cuts out approximately 20 sec.
the control unit. In rest KHE 81, the light signal is transmitted to
after the soldering gun is placed in the holder.
the control unit by an LED. In the case of rest KHE, the light inlet
3. Commissioning
is located in the holder funnel.
The solder fume extractor cuts out approximately 20 sec.
Check that the mains voltage is consistent with the information
after the soldering gun is placed in the holder.
on the type plate. If the mains voltage is correct, plug the con-
trol unit into an earthed safety socket.The green LED (2) indica-
3. Commissioning
tes that the system is ready to operate. The control unit is
Check that the mains voltage is consistent with the information
equipped for the operation of 2 soldering iron rests.
on the type plate. If the mains voltage is correct, plug the con-
trol unit into an earthed safety socket.The green LED (2) indica-
Technical Data
tes that the system is ready to operate. The control unit is
equipped for the operation of 2 soldering iron rests.
Mains voltage:
Power consumption:
Technical Data
Maximum breaking capacity:
Mains fuse:
Mains voltage:
Protection Class:
Power consumption:
Dimensions of control unit:
Maximum breaking capacity:
Mains fuse:
17
Protection Class:
Dimensions of control unit:
22
17
230 V AC
3 W
100 W
T 0.4A (5x20)
230 V AC
1
3 W
137 x 75 x 90
100 W
T 0.4A (5x20)
1
137 x 75 x 90
second light guide inlet has to be kept sealed. To connect the
light guide (1) loosen the clamp nut and insert the light guide as
far as the stop, then screw up the nut finger-tight. Next, insert
When being operated with one soldering iron rest only, the
the WFE mains cable into output socket (4) of the control unit
second light guide inlet has to be kept sealed. To connect the
and switch on.
light guide (1) loosen the clamp nut and insert the light guide as
far as the stop, then screw up the nut finger-tight. Next, insert
KHE:
the WFE mains cable into output socket (4) of the control unit
Place the FE soldering iron in the soldering gun holder and make
and switch on.
sure that the light inlet (1) is completely covered by the soldering
gun.
KHE:
Place the FE soldering iron in the soldering gun holder and make
KHE 81:
sure that the light inlet (1) is completely covered by the soldering
Insert the soldering gun plug into the socket in the safety rest.
gun.
Connect the safety rest connecting cable to the soldering station.
To ensure that the over-run control device functions properly, the
KHE 81:
temperature of the soldering gun must be within the control
Insert the soldering gun plug into the socket in the safety rest.
range.
Connect the safety rest connecting cable to the soldering station.
The solder fume extractor WFE shuts down after approx. 20 sec.
To ensure that the over-run control device functions properly, the
The WFE restarts when the soldering gun is removed from the
temperature of the soldering gun must be within the control
soldering gun holder.
range.
The solder fume extractor WFE shuts down after approx. 20 sec.
Standard setback (in digital soldering stations)
The WFE restarts when the soldering gun is removed from the
If the soldering tool is not used within a period of 20 minutes
soldering gun holder.
the temperature will be automatically reduced to a standby
temperature of 150°C (300°F). After three setback periods
Standard setback (in digital soldering stations)
(60 min.) the "AUTO OFF" function will be activated and the
If the soldering tool is not used within a period of 20 minutes
soldering iron will be switched off.
the temperature will be automatically reduced to a standby
4. Maintenance
temperature of 150°C (300°F). After three setback periods
(60 min.) the "AUTO OFF" function will be activated and the
To
ensure
that
the
soldering iron will be switched off.
it is important to ensure that the optical fibre (1) is connected
correctly between the holder and the control unit. If the optical
4. Maintenance
fibre is damaged, it can be cut to length again. In holders KHE,
To
ensure
that
the
the light inlet in the holder funnel must be cleaned with alcohol
it is important to ensure that the optical fibre (1) is connected
(methylated spirit) at regular intervals.
correctly between the holder and the control unit. If the optical
If the light inlet of the optical fibre (1) is damaged, the optical fibre
fibre is damaged, it can be cut to length again. In holders KHE,
can be reinserted and cut to length again.
the light inlet in the holder funnel must be cleaned with alcohol
For this purpose, the screw fitting of optical fibre (1) on the
(methylated spirit) at regular intervals.
soldering gun holder must be undone.
If the light inlet of the optical fibre (1) is damaged, the optical fibre
can be reinserted and cut to length again.
To replace the mains fuse, the control unit must be switched off
For this purpose, the screw fitting of optical fibre (1) on the
and isolated from the mains and the 4 control unit casing bolts
soldering gun holder must be undone.
must be removed. The fuse holder for glass tube fuse (5x20) is
on the circuit board.
To replace the mains fuse, the control unit must be switched off
and isolated from the mains and the 4 control unit casing bolts
must be removed. The fuse holder for glass tube fuse (5x20) is
on the circuit board.
device
functions
properly,
device
functions
properly,