EN
1
Nº
1
BRUSHLESS BOLT motor
2
Fixing base
3
Left limit switch plate
4
Right limit switch plate
5
Unlock key
6
Photocells
7
COPPER transmitter
Before starting the installation, please check that all the components mentioned above
are present in the packaging.
1. Check that the gate structure is resistant.
2. The guide rail must be securely fixed to the ground and must be perfectly straight,
with no kinks or other irregularities which may obstruct the movement of the gate
leaf, and must not have a gradient greater than 0.5%.
3. Check that the guide rails are in good condition and adequately greased.
4. Always install mechanical stops in the open and closed gate positions, well fixed to
the ground and provided with elastic damping elements (e.g. rubber) to cushion the
impact of the gate leaf against the stop.
5. Check that, when the motor is unlocked, the door doesn't move if left in any position.
60
MATIKGATE AUTOMATION
LIST OF COMPONENTS
2
3
x4
PRELIMINARY CHECKS
4
5
Description
6
7
Qtt
1
1
1
1
2
2
2