Descargar Imprimir esta página

Matikgate BOLT Manual De Usuario/Instalador página 63

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

MOTOR INSTALLATION
EN
The fixing base must be leveled and placed parallel to the gate, screw it to the ground
with the four screws provided. Pass the electrical cables of the connections, then screw
the automation to the fixing base.
After fixing the motor, fit and screw the cover with the two side screws.
63
MATIKGATE AUTOMATION

Publicidad

loading

Productos relacionados para Matikgate BOLT