• Mount the vent surround frame (R – Fig. 19-20) supplied
with the pellet loading drawer, in place of the one previously
removed.
• Refi t the slotted-in upper grille (N – Fig. 21), the lower grille
(O – Fig. 21) and the metal profi le plate (Y – Fig. 21) using the
screws previously removed.
• Open the pellet front loading drawer (S – Fig. 22), load the
pellets by pushing them inside the drawer using the scoop
provided (T – Fig. 22).
INSTALLATION
fi g. 19
R
fi g. 20
fi g. 21
T
fi g. 22
- 47
-
R
N
O
Y
S