Descargar Imprimir esta página

EdilKamin PELLKAMIN 10 Instalación Uso Y Mantenimiento página 46

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 89
INSTALLATION OF THE PELLET FRONT
LOADING DRAWER KIT (optional)
N.B.: THE INSTALLATION OF THE PELLET FRONT
LOADING DRAWER ALLOWS PELLETS TO BE LOAD-
ED IN THE HOPPER FROM THE FRONT WITHOUT
HAVING TO TURN OFF THE INSERT.
The insert is already prepared for the installation of the pellet
front loading drawer complete with vent surround frame.
ATTENTION:
THE OPERATION MUST BE PERFORMED BEFORE
INSTALLING THE INSERT.
To fi t, proceed as follows:
• Remove the slotted-in upper grille (N – Fig. 15), the lower
grille (O – Fig. 15) and the metal profi le plate (Y – Fig. 15)
using the screws.
Take care not to overtighten the bolt securing the top grille and
deform it; it must be possible to unscrew it/screw it back in
during maintenance.
Remove the vent surround frame (P – Fig. 16) from the struc-
ture using the screws.
• Proceed with the installation of the pellet loading drawer (Q –
Fig. 17-18) on top of the insert using the screws provided.
INSTALLATION
N
O
Y
fi g. 15
fi g. 16
fi g. 17
fi g. 18
- 46
-
P
Q
Q

Publicidad

loading