Figure 10 – WSH Disconnecting Switch (left) and WTH Disconnecting Switch (right).
6.1.1 Safety Signs
To conduct correct maintenance and cleaning operations, it is indispensible to take into consideration the indications reported
below.
During interventions, it is necessary to signal machine intervention using specific signs (these signs are positioned in such a
manner to prevent any undesired intervention on the machine).
During the interventions only authorised staff can access the work area.
WARNING:
DANGER:
All the materials with environmental impact which must be eliminated after maintenance interventions must be disposed of
according to norms in force.
WARNING:
In any case, to conduct all the maintenance and cleaning operations reported below on the machine, the following Individual
Protection Devices are necessary:
6.1.2 Verification of Material Availability
With an advance of at least 60 days from the fixed date for maintenance interventions, conduct a detailed examination of the
necessary material:
1.
check the material is in the warehouse,
2.
if necessary, ask the manufacturer's Technical Office for the missing pieces, at least 30 days in advance.
the maintenance and cleaning operations must only be conducted by expert and specialist
staff that have read and understood all the indications reported in this use and maintenance
handbook.
only dismantle the parts of the machine actually necessary to conduct the specific maintenance
operation. Furthermore, before re-delivering the machine to operators, it is necessary to verify its
integrity and functionality.
to dispose of materials with high environmental impact, if necessary, appoint specialist
structures.
WSH-WTH Pag. 51
REV. 01 04/14