Descargar Imprimir esta página

ESAB LTG 410 Manual Del Usuario página 25

Publicidad

Idiomas disponibles

Idiomas disponibles

29
27
6) INSTALLATION
6.1) Receiving
At receiving a LTG 410 remove all the packaging material around the unit and check for possible damages
that could have happened during transport. Any complaints related to transport damage should be
directed to the Transport Company.
N.B.: In case a LTG 410 is not installed immediately, keep it in its original
packaging or store it in a dry and well ventilated place.
6.2)Working area
Several facts should be taken into consideration when determining the working place of a welding machine,
in order to have a safe and efficient operation.
An adequate ventilation is needed for the refrigeration of the equipment and for the operator´s safety. The
area should be kept clean.
A circulation corridor should also be left around the LTG 410 with at least 700mm wide to provide ventilation
and access for operation, preventive maintenance and eventual corrective maintenance.
The installation of any filter dispositive in the environment restricts the air volume availabe for the machine
28
24
25
26
25
LTG 410

Publicidad

loading

Este manual también es adecuado para:

0400717