Conditioning, calibration, measurement
Combination
electrode CN 800
General
information
Before measuring
18
1
Remove the storage vessel.
2
Fill the bridge electrolyte ELY/BR/503 into the filling opening.
3
Shortly press the shaft of the combination electrode against the con-
nection head to wet the ground junction with bridge electrolyte.
4
When doing so refill any spilled bridge electrolyte so that the inner
junctions are covered with bridge electrolyte.
5
Rinse the combination electrode with deionized water.
6
Wipe the shaft using a clean paper towel.
Conditioning, calibration, measurement
When operating the electrode ensure that
the filling opening (1) for the bridge electrolyte is open
the inner junctions (3) are covered with bridge electrolyte
no air bubbles are in the bridge electrolyte
the depth of immersion is within the optimum range:
Minimum depth of im-
mersion
Maximum depth of im-
mersion
1
Condition every ion sensitive electrode in standard solution before
using it.
1
2
3
4
The ground junction (4) must be covered
Approx. 1 cm below the fluid level (2) of the
bridge electrolyte
CN 800
ba15356d04
12/2021