Preparing For Use; Suggested Coffee Measurement Chart; Adding Water And Ground Coffee - Mr Coffee TF Serie Manual Del Usuario

Ocultar thumbs Ver también para TF Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

To Set the Delay Brew Time:
1. Press the Set Delay Button. "Delay Brew
indicator will flash."
2. Set the brew time by pressing the Hour
and Minute buttons to your desired
time. The PM indicator will display when
a PM hour is shown.
3. Press the Set Delay button to lock in
the programmed time.
NOTE: To activate the Delay Brew cycle see the "Brewing
Coffee Later" section. To check the programmed time, press
the Set Delay button. The display will show the time you have
programmed the coffee to brew.

PREPARING FOR USE

Selecting and Measuring Ground Coffee
For best results, use a level tablespoon for ground coffee
measurement. Make sure you use medium grind coffee for a
perfect brew.

Suggested Coffee Measurement Chart

To Brew
Ground Coffee
5 Cups
6 tbsp.
2 Cups
3 tbsp.
BVMC-TF Series_16ESM1.indd 9-10
(Figure 1 – Set Delay)
1 level tablespoon (tbsp) = 5 gr./0.17 oz.
1 cup = 5 fl. oz. of brewed coffee
Use more or less coffee to suit your taste.
E7

Adding Water and Ground Coffee:

1. Lift and open the coffeemaker lid. For your convenience,
you can lift out the removable filter basket.
2. Place a MR. COFFEE
brand 4 cup paper basket-style filter
TM
or a MR. COFFEE
permanent
®
filter into the removable filter
basket. (Figure 2)
NOTE: If using paper filters, it
is important that the sides of
the filter fit flush against the
side of the filter basket. If filter
collapse occurs, dampen the
filter before placing in the filter
basket and adding ground
coffee and water.
3. Add the desired amount of
coffee and gently shake to level the coffee. See the
"Suggested Coffee Measurement Chart".
4. Be sure the filter basket is properly centered and all the
way down in the filter basket.
5. Fill the decanter with cold, fresh water to the desired
capacity (1 cup equals 5 ounces). For easy and accurate
filling, the water markings on the glass decanter and
on the dual water windows show the amount of water
needed to make the corresponding desired number of
cups. Do not fill past the "MAX line" or water will flow
out of the overfill hole in the back of the water reservoir.
The amount of coffee brewed will always be slightly less than
the amount of water poured in the water reservoir. This is due
to the minimum absorption of water by the coffee grounds.
6. Pour the water into the water reservoir. Close the lid and
place the empty decanter onto the warming plate.
NOTE: Make sure the decanter is fully placed on the warming
plate or the water and the grounds will overflow from the
(Figure 2 – Adding water and
ground coffee)
E8
10/11/16 2:36 PM

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Bvmc

Tabla de contenido