Descargar Imprimir esta página

Fronius MTB 330i G R Manual De Instrucciones página 37

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 39
Maintenance at
-
every start-up
-
1
1
2
*
-
Disposal
Dispose of in accordance with the applicable national and local regulations.
Check wearing parts
-
replace faulty wearing parts
Remove welding spatter from gas nozzle
Check the gas nozzle, spatter guard and insulation for damage and replace any
damaged components.
Also at every start-up when using water-cooled welding torches:
-
check all coolant connections for tightness (no leaks)
-
check that the coolant can flow unhindered
1
2
37

Publicidad

loading

Este manual también es adecuado para:

Mtb 400i g r