Operation: welding
4. The welding process takes approx. 3 to 4 seconds and is terminated with
a double signal sound.
Caution: moving the tool before the welding process has been completed
will always result in an error message and a faulty weld!
5. After completing the welding process, move the tool from the weld and
immediately place a magnet on the welded point. Allow the magnet to
remain for at least 1 minute. The magnet ensures the necessary pressure
and cooling of the stress plate. It is an essential part of achieving a good
weld!
The magnet must be placed within the first 3 seconds after terminating
the welding.
Check the underside of the magnet regularly and remove any metallic particles.
The magnet must not be rotated during or after positioning if there is contact
with the waterproof membrane. If this instruction is not followed, the water
proof membrane may be damaged.
6. Move to the next plate position and repeat the search and welding process as
described in steps 1 to 5.
7 . At the end of the welding work, switch off the tool at the main switch and then
disconnect from the mains.
Overlaps of waterproof membrane in the area of the stress plate should be
avoided. However, should this situation arise the special function of the welding tool
can be used. Instead of proceeding with normal welding, the
pressed. Now proceed as steps 1 to 5.
Important: the
x2
Full overlap
function will only remain active for one weld.
Partial overlap
function key can be
x2
Partial overlap
49