END CAP FRAMEWORK
Chalk Line
Base
Bracket
Bottom
Rail
FRAME
1.
Snap chalk line on floor in desired location.
(See Figure 2)
2. Lay out parts along chalk line. Use two uprights,
two base brackets and one base front for the first
section. (See Figure 2)
3. Push bracket into upright slots, then push down to
secure. Repeat for second upright. (See Figure 3)
NOTE: Do not adjust leveling legs on
base brackets or uprights at this time.
Figure 3
PAGE 4 OF 23
ASSEMBLY
Base Front
WARNING! The shelving system may collapse
and cause injury if the latch is not properly
engaged with the upright. A properly engaged
latch tab will be at the back of the slot.
(See Figures 4-5)
NOTE: Refer to page 2 for base bracket
removal and replacement.
Upright
Center Rail
Figure 4
Latch
Figure 2
Figure 5
0224 IH-4441