Set the Baud Rate to '19200'
Set the Parity to 'Even'
Stop bit must be 1 and Data bit must be 8
NOTE
Energy meter and EV Charger should have the same values.
Grid limit: maximum limit (in Ampere) of the grid connection for which load
balancing should be done. Before to set this value, check the main fuse of the
residential installation. This value should not be set higher than the main fuse!
To review 'Smart meter phase' and 'Phase connection order' to be
in line with installation setup and local
Push SAVE button to store the settings.
Please end with confirm configuration to store the configuration on the EV
charger.