Procedure
1. Unpack Equipment
Locate and identify parts shown in parts section.
Cabinet / Brine Tank
3. Assemble Softener
Larger units require media fill and or tank
connection.
Remove remote head and control valve.
Cover riser tube.
For CP216s OD: add media
¼" x ⅛" gravel
Flint gravel
Resin
Reattach remote and control valve.
Lube O-rings
Connect tanks
5a. Connect Adapters for Classic Control Valve
Systems
Lube O-rings
Insert adapters
Insert adapter bracket
Insert adapter pin
Instructions
Parts Pack
Brine Line
Drain Line
Softener Assembly
Media / Tank
14.2 L
7.1 L
113.3 L
2. Test Water Quality
Confirm water quality to determine proper setup.
Total Hardness
pH
Ferrous Iron
Ferric Iron
4. Position Softener
Position softener and brine
tank on a level surface.
If within 3 meters of hot water
tank, make sure an expansion
tank is used.
Environmental conditions:
50º C Max., protect from
freezing
Water conditions:
Temperature
1 – 50º C
Pressure:
1 – 8.5 Bar
CP Units:
1.7 – 8.5 Bar
5b. Connect Adapters for Mach Control Valve Systems
Install O-rings
Lube O-rings
Insert adapters
Insert E-clips
3