Descargar Imprimir esta página

Kinetico 2020c Instrucciones De Instalación página 5

Ocultar thumbs Ver también para 2020c:

Publicidad

Idiomas disponibles

Idiomas disponibles

Procedure
9. Set Brine Valve
Float Cup Setting (all units)
Remove the brine valve assembly and rest it on a flat surface.
Remove rubber band.
Height is measured from the base of the brine valve assembly to the top
of the float cup (see drawing at right).
Adjuster Tube Setting (standard and commercial units)
Cut and remove tabs on both sides of the tube.
Remaining number or letter imprinted on the tab determines the
correct setting. The drawing at right shows an adjuster tube at
setting "M".
5
Float Cup
Setting

Publicidad

loading