Descargar Imprimir esta página

Grip Rite GR309EDV Manual Del Operador página 14

Compresor eléctrico

Publicidad

Idiomas disponibles

Idiomas disponibles

OPERATION
Before being operated with pressurized tanks for the first time, your new
compressor requires a simple set-up procedure that will help your unit deliver
years of trouble-free service. Failure to follow all initial set-up instructions may
result in serious damage to your compressor, property damage, or serious injury
to operator and bystanders. Do not allow compressor to pressurize tanks until
all set-up steps have been performed.
SET UP PROCEDURE
1. Read the manual and all warning
labels on the unit.
2. Check compressor oil level, and fill as
needed. (See #9 below)
3. Open the tank drain cocks (A),
or outlet valve.
4. Start the compressor (see page 12),
and run the compressor for 20
minutes with drain cock open to
lubricate the bearings and pistons.
5. After 20 minutes, close the drain
valve or outlet valve.
6. Compressor is now ready for normal,
pressurized operation.
7. After first 24 hours of operation, check
V-belt tension. Correct tension setting
is 1/2" of slack when measured at
midpoint between pulleys.
8. Check bolts and nuts periodically and
tighten when necessary.
9. Check oil level at sight glass (B).
Oil level must be maintained between
"L" (Low) and "H" (High) indicator lines. To add oil, remove oil filler plug (C) and fill
until sight glass shows proper level. Change oil after first 100 hours of operation.
Add non-detergent mineral oil to compressor.
10. Use chart below for correct viscosity:
Air Temperature
3 – 32° F (16 - 0° C)
34 – 79° F (1 - 26° C)
80° F & Up (2° C)
11. Replace oil filler plug before starting compressor.
DANGER
Viscosity
SAE 10W (ISO 32)
SAE 20W (ISO 68)
SAE 30W (ISO 100)
14

Publicidad

loading