Descargar Imprimir esta página

Baxi Compact 7 V750 Serie Manual De Instalación Y Mantenimiento página 63

Publicidad

Idiomas disponibles

Idiomas disponibles

4 COMMISSIONING
4.1
Initial commissioning
Initial commissioning must be performed by a qualified professional.
4.2
Checklist after commissioning
A few days after the appliance is commissioned, please:
Check the installation
Check the tightness of the connections
Check the water pressure
Check that there are no errors on the control panel
Inform the user of the frequency of maintenance work to be carried out
Explain how the system and control panel work to the users
Hand over all manuals to the user
4.3
Operating the Unit
Mode #
1
800W power heating (single tank)
2
1600W power heating (both tanks)
3
Energy saving Active (Temp. = 55°C)
4
Smart control energy Active
5
Anti-legionella mode Active (Temp. = 80°C during 5 min)
6
Reservation
Mode description
Mode Active
Indicator
Indicator 4 ON
Indicator 5 ON
Indicator 8 ON
Indicator 9 ON
-
Indicator 6 ON
Fig.7
63

Publicidad

loading

Este manual también es adecuado para:

Compact 7 v780 serieCompact 7 v710 serie