4 COMMISSIONING
4.1
Initial commissioning
Initial commissioning must be performed by a qualified professional.
4.2
Checklist after commissioning
A few days after the appliance is commissioned, please:
●
Check the installation
●
Check the tightness of the connections
●
Check the water pressure
●
Check that there are no errors on the control panel
●
Inform the user of the frequency of maintenance work to be carried out
●
Explain how the system and control panel work to the users
Hand over all manuals to the user
●