Descargar Imprimir esta página

ABB ACH580-04 Manual De Instrucciones página 6

Ocultar thumbs Ver también para ACH580-04:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 29
6 EN – Quick installation guide (IEC)
Step
4
Screw in and tighten the insulators to the drive module by hand. Install the
T3/W2 connection terminal to the insulators.
EN
5
Connect the phase T3/W2 conductors to the T3/W2 terminal.
6
Install the T2/V2 connection terminal to the insulators. See the warning in step 4.
DA
7
Connect the phase T2/V2 conductors to the T2/V2 connection terminal.
8
Install the T1/U2 connection terminal to the insulators. See the warning in step 4.
9
Connect the phase T1/U2 conductors to the T1/U2 terminal.
DE
10
Option +B051 (if there is no bottom plate in the cabinet and degree of
protection of IP20 is needed):
• Carefully step drill sufficiently big holes to the inner clear plastic shrouds for the
ES
motor cables to be connected. Smooth the hole edges. Cut the shroud from the
holes to the edge to make it possible to put the shroud around the cables.
• Remove the plastic sheeting from both sides of the shrouds.
FI
11
Option +B051: Put the inner clear plastic shrouds of figure
cables.
FR
12
Option +B051: Remove the plastic sheeting from both sides of the output clear
plastic shroud. Install the shroud to the drive module.
13
Option +B051: Install the lower front cover to the drive module.
IT
Step
1
Ground the input cable shields (if present) 360 degrees at the cabinet entry.
NL
2
Connect the twisted shields of the input cables and separate ground cable (if
present) to the cabinet grounding busbar.
PL
3
Option +B051:
• Carefully step drill sufficiently big holes to the cable entry clear plastic
shroud for the cables to be connected.
PT
• Align the holes in the vertical direction according to the alignment holes in
the shroud. Smooth the hole edges.
• Remove the plastic sheeting from both sides of the shroud.
RU
• Attach the cables firmly to the cabinet frame to prevent chafing against the
hole edges.
4
Option +B051: Put the conductors of the input cables through the drilled holes
SV
in the clear plastic shroud.
5
Connect the input power cable conductors to the L1/U1, L2/V1 and L3/W1
connection busbars.
TR
6
Option +B051: Move the clear plastic shroud along the input cables to its final
position. Install the front clear plastic shroud.
7
Install the upper front cover.
ZH
8
Remove the cardboard protective covering from the drive module air outlet.
9
Option +B051: Cut a hole in the side clear plastic shroud for the cable entry
clear plastic shroud. Install the side and top shrouds to the drive module.
Install the air baffles
See figure
W
on page
manual.
Task (motor cables)
WARNING! Do not use longer screws or greater tightening
torque than given in the installation drawing. Doing either can
damage the insulator and cause dangerous voltage to be
present at the module frame.
Task (input cables)
100
and Generic cabinet planning instructions in the hardware
Figure
M
N
-
-
-
-
O
O
around the motor
P
Q
Q
Figure
-
-
R
S
T
U
U
U
V
Page
98
98
-
-
-
-
99
99
99
99
Page
-
-
99
99
99
100
100
100
100

Publicidad

loading