Descargar Imprimir esta página

Bosch GHT 130 Professional Manual Original página 10

Ocultar thumbs Ver también para GHT 130 Professional:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 15
10 | English
Floor Removal Cart
– Height (lowest position)
– Length (lowest position)
– Width
Approx. weight (without demoli-
tion hammer)
Values can vary depending upon the product and are subject to ap-
plication and environmental conditions. For further information
www.bosch-professional.com/wac.
Assembly
Items Included and Assembly Tool
See the list of items included at the start of the
operating manual.
Carefully remove all parts of the trolley included in the deliv-
ery from their packaging. Remove all packing material.
Check to ensure that all the parts listed below have been
supplied before assembling the trolley:
– Trolley frame (2)
– Handle section (5)
– 2 transport wheels (7) with corresponding fastening
set (12) (4 washers and 4 splints)
– Demolition hammer fastening set (14) consisting of:
1 top panel (10), 2 handle receptacle fastening
blocks (8), 2 tool holder fastening blocks (9), 4 M10
threaded rods (13), 4 star grip nuts, 8 washers, 4 spring
lock washers and 4 lock nuts
You also need the following tools for assembly (not among
the items included):
– Open-ended spanner 19 mm
– Open-ended spanner 17 mm
– Pliers
– Hex key 2 mm
Fitting the Handle Section (see figure A)
Loosen the screws (15) on the handle section with an open-
ended spanner of 19 mm until you can remove the mounting
plate (16).
Place the handle section (5) on the top end of the trolley
frame (2). Place the mounting plate (16) onto the
screws (15) of the handle section from below, and tighten
the screws (15).
Fitting the Transport Wheels (see figures B−C)
Remove the prefitted outer splint and the outer washer on
both ends of the wheel axle.
Push one transport wheel (7) each onto the wheel axle. Put
the outer washer back on at each end.
Push one splint (11) through the outer cross hole in the
wheel axle in each case, and bend it to secure the transport
wheel.
1 609 92A 8H1 | (08.09.2023)
Fitting the Demolition Hammer
GHT 130
(see figures D−H)
mm
640
Only carry out the assembly on an even, horizontal surface.
mm
1000
Remove the carrying handle of the demolition hammer be-
mm
570
fore assembly. Please refer to the operating instructions for
kg
27
the demolition hammer.
Image D:
– Set the lowest working angle (see "Setting the Working
Angle", page 11) on the trolley.
– Place the bottom end of the trolley frame on a stable sur-
face of the appropriate height, so that the surface area for
the demolition hammer is aligned horizontally.
Images E−F:
– Place a handle receptacle fastening block (8) on the up-
permost frame slot of the trolley.
– Place a tool holder fastening block (9) on the bottom-
most frame slot of the trolley. Turn the fastening block as
shown in figure F, in a way that's appropriate for the de-
molition hammer that's meant to be used.
– Put one threaded rod (13) each through the ends of the
fastening blocks. The tabs of the threaded rods must
point outwards.
– Put one washer and one lock nut each – from the demoli-
tion hammer fastening set (14) – onto the bottom end of
the threaded rods. Loosely tighten the lock nuts with an
open-ended spanner of 17 mm.
Image G:
– Place the demolition hammer on the fastening blocks so
that the coil spring damping of the demolition hammer is
in the recess of the tool holder fastening block (9). En-
sure that the lock bolt and the retaining bracket on the
tool holder of the demolition hammer remain accessible
when the tool is changed later.
GSH 16-28: Open the retaining bracket.
Image H:
– Place the second handle receptacle fastening block (8)
on the top threaded rods, and the second tool holder
fastening block (9) on the bottom threaded rods (at the
same orientation as the bottom tool holder fastening
block (9)). Push both blocks onto the demolition hammer
as far as they will go.
– Place the top panel (10) onto the threaded rods with the
recess over the tool holder.
– Tighten the locking nuts on the bottom end of the
threaded rod with an open-ended spanner of 17 mm.
– Put one washer and one spring lock washer each – from
the demolition hammer fastening set (14) – onto the top
end of every threaded rod.
– Put one star grip nut each – from the demolition hammer
fastening set (14) – on every threaded rod and tighten it
well.
Hang the cable of the demolition hammer in the cable
suspension (6) at the handle.
Read and observe the demolition hammer operating instruc-
tions for the assembly of the application tool in the demoli-
Bosch Power Tools

Publicidad

loading

Este manual también es adecuado para:

1 600 a02 wm0