Descargar Imprimir esta página

Kohler K-2333 Guia De Instalacion página 4

Lavabos de sobreponer
Ocultar thumbs Ver también para K-2333:

Publicidad

Idiomas disponibles

Idiomas disponibles

Backsplash
Faucet supply cut-out
hole for K-2333-1 only
Mark the center of
each of the four
drilling holes
Cut--out Line
2. Position the Template
- Determine your desired cut-out location.
NOTE: The lavatory center must be at least 12" (30.5cm) from the
wall to ensure there is no interference between the lavatory and the
wall.
- Cut out the template along the inside line labeled "Cut-Out" using a
scissors.
- Position the template on the countertop in the desired location. Make
sure the template is secured firmly in place so it cannot move.
- Make sure there is adequate clearance between the lavatory, faucet,
and backsplash.
- Trace the inside edge of the template on the countertop with a pencil.
- Mark the exact centers of the four drilling holes.
- If installing the K-2333- 1, mark the faucet supply hole location.
- Remove the template.
3. Drill the Mounting Holes
- Drill four 5/16" holes at the marked hole centers.
- Using a saber saw, cut the sink hole in the countertop following the
marked line.
- If installing the K-2333- 1, cut or drill the faucet supply hole now.
B
1023121-2-
Drill a 5/16" hole at
each marked spot
4
Cut at inside line
Kohler Co.

Publicidad

loading

Este manual también es adecuado para:

K-2333-1-wh