baltur BT 75 DSPN Manual De Instrucciones página 10

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

APPLICATION OF THE BURNER TO BOILER
for model BT 100 ÷ 120 DSPN / D (steel fixing flange)
for model BT 40 - 50 - 75 - 180 - 250 - 300 - 350 DSPN / D
1 Boiler plate
2 Flange with insulating materials
3 Seam with insulating materials
4 Burner securing flange
5 Stud bolts, washers and nuts for fastening to the boiler
6 Nuts screws and washers to fasten flange to the sleeve
COMBUSTION HEAD ASSEMBLY
To put in place insulation flange 2, which must be positioned between
the burner and the plate of boiler 1, the end of the combustion head
must first be removed.
a) A djust position of connector flange 4 by loosening screws 6 so
that the combustion head penetrates into the combustion chamber
the amount recommended by the generator's manufacturer.
b) Position seal insulation 3 on the tube unit.
c) Fasten the combustion head assembly to the boiler 1 using the stud bolts, washers and the nuts provided 5.
d) With suitable material, completely seal the space between the tube unit of the burner and the hole on the refractory plate inside the
boiler door.
1 - Boiler plate
2 - Insulating gasket
3 - Burner fixing flange
4 - Elastic collar
5 - Stud bolt
6 - Locking nut with washer
7 - Nut and washer for fastening the first
8 / 31
98321_2010/03
flange
E
N
G
L
I
S
H

Publicidad

Tabla de contenido
loading

Tabla de contenido