Descargar Imprimir esta página

Kohler K-7202 Guia De Instalacion página 4

Desague de banera
Ocultar thumbs Ver también para K-7202:

Publicidad

Idiomas disponibles

Idiomas disponibles

Apply plumbers
putty.
Overflow Seal
Overflow Body
Overflow Pipe
Tailpiece
2. Install the Overflow
Remove the overflow seal from the packaging and position it on
top of the overflow body.
Apply plumbers putty or other sealant to the top edge of the
overflow seal according to the putty manufacturer's instructions.
Align the overflow body to the bath overflow and the waste body
to the bath waste. The tee should be square to both the bath
overflow and waste body.
Remove the back plate and overflow ferrule from the packaging.
Make sure the overflow is positioned properly in relation to the
bath.
Position the back plate on the top of the bath and hand tighten
with the overflow ferrule. Do not fully tighten at this time.
3. Install the Waste Tubing
Remove the waste seal, waste flange, and waste ferrule from the
packaging.
Apply plumbers putty or other sealant to the middle (vertical)
area of the waste seal according to the putty manufacturer's
instruction's.
Position the waste seal into the bath waste from the underside of
the bath. The smaller diameter of the seal will be visible from the
top of the bath.
1013265-2-D
Overflow Ferrule
Back Plate
Bath
Plug
Waste Ferrule
Waste Flange
Apply plumbers
putty to water seal.
Tee
Waste Body
Waste Pipe
4
Kohler Co.

Publicidad

loading